Commercial Building
Hitech City, Hyderabad
• Completed Aug 20, 2026
Basement Hydrostatic Pressure PU Injection at Hitech City Commercial Tower
!
The Water Ingress Problem
Severe active water ingress through basement retention wall cold joints and elevator pit during heavy monsoon season, risking electrical lift mechanisms.
✓
Engineering Treatment & Execution
Drilled 140 high-pressure packer ports along cold joints and injected hydrophobic polyurethane resin at 250 bar pressure. Active leaks were arrested instantly, followed by a double-coat crystalline barrier slurry across the entire basement slab perimeter.
Before & After Visual Inspection
AFTER: REPAIRED
BEFORE: LEAKAGE
Experiencing a Similar Seepage Challenge?
Get a senior structural engineer to survey your site anywhere in Hyderabad within 24 hours.